Saturday, June 14, 2008

Laying pipe for water/telecom to the pad

Friday we laid 450 feet of pipeline. Trenching to 30", bottom layer of sand, glueing pipe, adding Cat 5e, top layer of sand, and backfilling. The temperature was 98 degrees!
















Trenching with a DitchWitch.
Speed was about one foot per minute.
Quote: "This clay is like concrete".




















Ricky (in orange) is our foreman.
The guy with the paint splotches is...our painter
















Pipe and telecom are placed on top of a layer of sand for drainage















Then, covered with another layer of sand















Then, backfilled.















Almost finished!






No comments: